elevate appreciate there are many different types of stakeholder who contribute to the construction industry. The elevate management system has many benefits to all project participants.
Investors
Investors need the security that costs are under control, progress is maintained and on schedule and that the design specifications are being adhered to. The elevate Management System provides a full audit trail allowing investors to see exactly how the project is progressing and ensures cash flow is maximised to its best ability.
Architects
Architects are usually at the hub of all construction, visualising the client’s needs and turning the vision into reality through working drawings. There are many pressures placed upon architects regarding progress and costs. The elevate Management System provides extensive information on design factors, including highlighting if any design elements are incomplete or pending. This ensures the design process keeps ahead of the construction process at all times.
Irrespective of scale, the systems fully links the design process with the construction and financial elements of the build.
Main Contractor
Main contractors have the main responsibility over completion and costs, ensuring that both targets are met with little error.
The elevate Management System minimises main project risks by making everyone involved fully accountable. From the groundworks to the fixtures and fittings, the software ensures every process is carefully monitored and checks all sub-contractors are providing the services they have quoted for.
Sub - Contractors
There are a vast number of factors which can affect a sub-contractors ability to complete their work in the designated time scale. Elevate management system tracks every aspect of the construction process and by documenting all occurrences, allows for full cost recovery. The extensive audit system can provide evidence and records, should any contractual matters arise.
Site Managers
Site managers do not escape either, they too are tracked. The elevate Management system shows the productivity of each individual operative. While the system checks are fully comprehensive, managers should have no problem in completing them in the standard working day.
Quantity Surveyors
With automated valuations there is no need for Quantity Surveyors to trudge around the site checking valuations are correct as this is done automatically, with progress, quality and damage monitored closely. The link with the automated correspondence means the recovery of all additional costs to the contract is simple.
|